Décret n° 2-22-431 du 15 chaabane 1444 (8 mars 2023) relatif aux marchés publics
Article 112 : Procès–verbal de la séance d’examen des
Official English translation
The architectural consultation jury draws up, immediately, minutes of each of its meetings. These minutes, which are neither made public nor communicated to the competing architects, mention the maximum estimated budget drawn up by the project owner, mention where applicable any observations made by the members of the jury during the tender examination process and state their points of view on these observations. The minutes shall also state the reasons for excluding the excluded competing architects and the criteria on which the jury based its proposal to the project owner to select the tender he judges to be the most advantageous in the light of the criteria set out in the consultation regulations. The minutes are immediately signed by the president and the members of the jury. Any report drawn up by the sub-commission or expert, as appropriate, is attached to the minutes of the tender examination session. An extract from the minutes is published on the public procurement portal and posted within the premises of the project owner's organisation within twenty-four hours following the date of completion of the jury's work. This extract must be posted for at least fifteen days. Decree on public procurement-No. 2-22-431-8 March 2023 103
Published by the Moroccan public procurement portal. The French version is the only authoritative text.
Une question sur cet article ?
L'assistant juridique de Soumize répond en citant le texte applicable (décret, CCAG, arrêtés) et signale quand une règle a été abrogée ou remplacée.
Essayer Soumize gratuitementB.O. n° 7184 du 6 avril 2023. Texte reproduit à titre d'information ; seule la publication au Bulletin officiel fait foi.