Décret n° 2-22-431 du 15 chaabane 1444 (8 mars 2023) relatif aux marchés publics
Article 110 : Evaluation des propositions des architectes
Official English translation
1 –The jury continues its work behind closed doors. 2 –The jury checks the calculations of the financial proposal, rectifies any arithmetical errors and rejects architects whose fee proposals : –Are not signed; –Are signed by persons not authorised to bind the architects concerned; –Express restrictions or reservations; –Are higher than the maximum or lower than the minimum rates provided for in Article 93 of this Decree. Decree on public procurement-No. 2-22-431-8 March 2023 101 3 –The jury rates the fee proposals by assigning a score out of one hundred (100) points to the most advantageous fee proposal and marks inversely proportional to the amounts of the other fee proposals. 4 –The jury evaluates the bids in order to select the most advantageous bid. To this end, it weights the scores obtained by each architect on the basis of the technical proposal, the rough estimate, excluding taxes, of the overall cost of the works based on the project's surface area ratios and the fee proposal. The overall score will be obtained by adding together the technical score, the rough estimate score and the financial score, after applying a weighting as follows: –Seventy percent (70%) for the technical proposal ; –twenty percent (20%) for the rough estimate; –Ten percent (10%) for the fee proposal. The architect with the highest overall score is awarded the contract. 5 –The jury will rank the proposals submitted by the selected architects with a view to proposing the most advantageous tender to the project owner. In the event that several bids, judged to be the most advantageous, have obtained equivalent overall scores, the jury will select the architect who has obtained the best score for the technical proposal. If the scores for the technical proposals are also equivalent, the jury will draw lots to designate the architect to be selected. 6 –By registered letter with acknowledgement of receipt, the president of the jury shall invite the competing architect who has submitted the most advantageous offer to : –Produce the documents of the administrative file referred to in subparagraph B of paragraph I) of article 103 of this decree ; –Confirm the corrections of material errors found, if applicable. –Address any discrepancies noted between the various documents in his file, where applicable. To this end, the jury shall set a time limit which may not be less than seven days from the date of receipt of the letter referred to above. 7 –The jury meets on the day and at the time set. However, the president may invite the members of the jury to resume its work as soon as responses from the architects concerned have been received. The jury checks the existence of the medium used to invite the architect concerned and verifies the responses and documents received. After examining the documents and responses received, the jury decides: a) Whether to propose to the project owner to accept the proposal of the architect concerned, b) Or to disqualify the architect concerned, when the latter : –Does not reply within the time limit given to him; –Does not produce the required documents or produces non-conforming documents; –Does not confirm the rectification of material errors requested, where applicable ; –Fails to rectify discrepancies between the various documents in his file, if applicable. Decree on public procurement-No. 2-22-431-8 March 2023 102 If the jury excludes the architect concerned in one of the cases referred to in b) above, it invites, in the same way, the architect whose bid is ranked second. It shall examine the documents and responses received and shall decide whether to accept or reject the bid. If the jury does not retain the tender of the architect concerned, it will invite the architect whose offer is ranked next and will examine his responses and documents in accordance with the provisions of this paragraph, until the procedure has been completed or the architectural consultation has been declared unsuccessful. With a view to awarding the architects the prizes provided for in the consultation programme, the jury invites, by registered letter with acknowledgement of receipt, the competing architects whose bids are ranked next after the bid of the architect awarded the contract, to produce the documents and responses provided for in paragraph 6 of this article.
Published by the Moroccan public procurement portal. The French version is the only authoritative text.
Une question sur cet article ?
L'assistant juridique de Soumize répond en citant le texte applicable (décret, CCAG, arrêtés) et signale quand une règle a été abrogée ou remplacée.
Essayer Soumize gratuitementB.O. n° 7184 du 6 avril 2023. Texte reproduit à titre d'information ; seule la publication au Bulletin officiel fait foi.